Source-linked configuration dossier
ES&S EVS 6.4.0.0 / DS200
A source-linked pilot dossier for the DS200 within the EAC-certified EVS 6.4.0.0 configuration, with historical change records, separately scoped optional modem models and vulnerability reviews, and a labeled Washington deployment observation.
Version evidence
Last sourced observations
“Last” means latest in this reviewed source package, not a live device reading or the newest product-family release.
EAC-certified firmware
3.1.0.0
This is the firmware in the certified EVS 6.4.0.0 configuration, not a live reading from a deployed unit and not a claim about the newest EVS family firmware.
- U.S. Election Assistance Commission: EVS 6.4.0.0 Certificate and Scope of Conformance Pages 1-10, especially proprietary components on pages 6-7
- Pro V&V, Inc.: ES&S EVS 6.4.0.0 Certification Test Report TR-01-01-ESS-2023-01.03 Sections 3.2, 3.3, and Tables 4-1 through 4-3
Washington-approved firmware
3.1.0.0
Washington's approved configuration is not a county device inspection.
Washington-approved hardware revisions
1.2, 1.3, 1.3.13
The state record lists approved revisions; it does not identify which revision a county deployed.
VSTL + EAC change control
Configuration change history
These are source-linked certification and change records. Field deployment remains separate and unknown unless explicitly documented.
Exterior seal-area change for DS200 hardware 1.3.10.0.
- VSTL
- Pro V&V, Inc.
- Dossier relationship
- historical ds200 family change
- Field deployment
- unknown
The record does not establish inclusion in the EVS 6.4.0.0 baseline or local installation.
- U.S. Election Assistance Commission: ESS-983 engineering change record ECO metadata and attachment
- Pro V&V, Inc.: ES&S ECO 983 analysis DS200 hardware 1.3.10.0 seal-area change
End-of-life replacements and related DS200 hardware 1.3.11 changes: touchscreen controller, LCD/bracket/LVDS cables, display service subassembly, quad-core processor, scanner-board motor-driver accommodation, and USB-hub power-cable wire gauge.
- VSTL
- Pro V&V, Inc.
- Dossier relationship
- historical ds200 family change
- Field deployment
- unknown
The ECO documents an approved historical configuration change, not the internals of every DS200 or an EVS 6.4.0.0 deployment.
- U.S. Election Assistance Commission: ESS ECO 1042 approval Approval letter
- U.S. Election Assistance Commission: ESS-1042 engineering change record ECO metadata, analysis, and approval attachments
- Pro V&V, Inc.: ESS ECO 1042 Analysis Page 1 overview and affected systems
Scanner-board FPGA-code update described as improving thermal stability and calibration resolution.
- VSTL
- Pro V&V, Inc.
- Dossier relationship
- historical ds200 family change
- Field deployment
- unknown
The source does not identify the board or FPGA revision installed in a particular EVS 6.4.0.0 unit.
- U.S. Election Assistance Commission: ES&S ECO 1035 approval Approval letter
- U.S. Election Assistance Commission: ESS-1035 engineering change record ECO metadata, analysis, and approval attachments
- Pro V&V, Inc.: ES&S ECO 1035 Analysis Form Page 1 overview and affected systems
Ballot-box change adding a ballot-bag option.
- VSTL
- Pro V&V, Inc.
- Dossier relationship
- historical ds200 family change
- Field deployment
- unknown
An approved accessory option does not establish use by a particular jurisdiction.
- U.S. Election Assistance Commission: ESS ECO 1044 approval Approval letter
- U.S. Election Assistance Commission: ESS-1044 engineering change record ECO metadata, analysis, and approval attachments
- Pro V&V, Inc.: ESS ECO 1044 Analysis Page 1 analysis
Collapsible ballot-box change adding a ballot-trolley/binning option.
- VSTL
- Pro V&V, Inc.
- Dossier relationship
- historical ds200 family change
- Field deployment
- unknown
An approved accessory option does not establish use by a particular jurisdiction.
- U.S. Election Assistance Commission: ES&S ECO 1055 approval Approval letter
- U.S. Election Assistance Commission: ESS-1055 engineering change record ECO metadata, analysis, and approval attachments
- Pro V&V, Inc.: ES&S ECO 1055 Analysis Page 1 analysis
Tote-bin security gasketing intended to prevent cards or ballots from entering through hinge-area gaps; Pro V&V states the change was reviewed and functionally tested and requires no firmware/software change.
- VSTL
- Pro V&V, Inc.
- Dossier relationship
- approved for evs 6400
- Field deployment
- unknown
EVS 6.4.0.0 is listed as affected, but local installation is not established.
- U.S. Election Assistance Commission: ECO ESS 1165 approval letter Approval letter
- U.S. Election Assistance Commission: ESS-1165 engineering change record ECO metadata, analysis, and approval attachments
- Pro V&V, Inc.: ES&S ECO 1165 Analysis Rev. 01 Page 1 analysis and affected systems
Findings and public status
Tests, limitations, and listing gaps
Neutral finding types replace a generic “bugs” bucket so affected versions and source scope remain visible.
Pro V&V anomaly status
The certification test report states that no anomalies occurred during the EVS 6.4.0.0 test campaign.
- Pro V&V, Inc.: ES&S EVS 6.4.0.0 Certification Test Report TR-01-01-ESS-2023-01.03 Sections 3.2, 3.3, and Tables 4-1 through 4-3
Deficiencies described but not itemized
The public report says encountered deficiencies were tracked and resolutions verified as needed, but section 3.3 does not itemize those deficiencies.
- Pro V&V, Inc.: ES&S EVS 6.4.0.0 Certification Test Report TR-01-01-ESS-2023-01.03 Sections 3.2, 3.3, and Tables 4-1 through 4-3
Previously scanned ballot is not automatically distinguished
Washington's staff report states that EVS 6.4.0.0 cannot distinguish whether a ballot was previously scanned and describes ballot-handling and staffing controls recommended by ES&S.
No advisory attachment listed on selected EAC record
The archived EAC EVS 6.4.0.0 record did not list an advisory attachment when retrieved on 2026-07-19.
- U.S. Election Assistance Commission: EVS 6.4.0.0 certification record Certification record and public attachments
Power evidence
Backup supply and runtime
Named power equipment is rendered exactly as sourced. Missing capacity and runtime remain explicit instead of being inferred from another device or installation.
DS200 power / backup supply
The ES&S one-sheet confirms DS200 battery backup. The certification and state records reviewed here do not publish the battery manufacturer, model, chemistry, capacity, runtime, condition, or jurisdiction power topology.
- Supply type
- battery backup
- Manufacturer
- Not publicly confirmed
- UPS model
- Not publicly confirmed
- Capacity
- Not specified in reviewed source
- Runtime
- Not specified in reviewed source
- U.S. Election Assistance Commission: EVS 6.4.0.0 Certificate and Scope of Conformance Pages 1-10, especially proprietary components on pages 6-7
- Election Systems & Software: DS200 Poll Place Scanner and Tabulator One-Sheet Pages 1-2
- Pro V&V, Inc.: ES&S EVS 6.4.0.0 Certification Test Report TR-01-01-ESS-2023-01.03 Sections 3.2, 3.3, and Tables 4-1 through 4-3
- Washington Office of the Secretary of State: Report on the Examination of ES&S EVS 6.4.0.0 Pages 3-6
Deployment evidence
Dated jurisdiction observations
Deployment records remain at their documented grain. A system-level observation does not establish unit components, firmware, change adoption, or power configuration.
| Jurisdiction | Observation | System version | Components confirmed |
|---|---|---|---|
| Jefferson County, Washington | November 2025 general election | 6.4.0.0 | Not established at component or unit grain |
| Thurston County, Washington | November 2025 general election | 6.4.0.0 | Not established at component or unit grain |
| Walla Walla County, Washington | November 2025 general election | 6.4.0.0 | Not established at component or unit grain |
| Whitman County, Washington | November 2025 general election | 6.4.0.0 | Not established at component or unit grain |
- Washington Office of the Secretary of State: Voting systems used by county County table and November 2025 version note